Arnold Dining Center Sewer Replacement
This project required a time sensitive investigation, design, and replacement, after the failure of the sanitary sewer under the kitchen concrete floor, at the largest catering and dining service at OSU. The design solution allowed the work to be completed while not interrupting the cooking and catering facility. The project budget was $40,000 and owned by the University Housing and Dining department.
- Cutting tiled concrete floor in kitchen
- Excavation under kitchen slab
- Exposing failed sewer mainline
- Excavation pit for sewer lateral
- Exposed sewer lateral
- Failed sewer line
- Failed sewer fittings
- New pipe ready for replacement
Return to Projects page.